Wet Area & Podium Falls and Waterproofing Preparation in Sydney

Correct falls and low points in wet areas, podiums and roofs ahead of membrane works.

  • Based in South Granville
  • Sites across Sydney and NSW
Balcony floor screeded to falls around the floor waste before waterproofing

A membrane is only as good as the surface under it. FCPR prepares wet areas, podiums and roofs across Sydney and NSW for waterproofing by correcting falls, building up low spots and finishing the surface, with the aim of reducing rework before the waterproofer arrives.

Quality Workmanship Fast & Reliable Built To Last NSW And Beyond Competitive Pricing

Wet area falls preparation

Wet areas need the right falls to the drain before the membrane goes down. FCPR's wet area preparation covers:

  • Preparing showers, balconies and wet zones for membrane works
  • Correcting surface falls and local low points
  • Creating cleaner bases around drains and set-downs
  • Coordinating the surface finish for follow-on waterproofing

Podium and roof falls rectification

On podiums and roof areas where drainage, ponding or presentation needs improvement, FCPR builds falls and corrects low spots around drains, then patches, skims and shapes the concrete so it is ready for waterproofing. The work can be carried out across open roof and podium areas in support of the project team ahead of membrane installation.

Shapes that support the membrane

Waterproofing details often depend on concrete shape as much as falls. FCPR also adjusts fillets and upturn radiuses where the formed shape needs a cleaner transition, blending the repair into the surrounding concrete. Builders and concreters can send the areas through the quote form, and drawings or photos on WhatsApp, to have substrate falls checked and corrected.

Before and After

Real photos from recent FCPR jobs: the same area before and after the work.

Before: Balcony floor waste area: rough slab, then screeded
After: Balcony floor waste area: rough slab, then screeded
Balcony floor waste area: rough slab, then screeded
Before: Balcony topping: wet screed, then finished
After: Balcony topping: wet screed, then finished
Balcony topping: wet screed, then finished

Get a quote for waterproofing preparation & falls

Send the job details, defect type, suburb and best contact number. FCPR can review the issue and get back to you about the next step.

Send your quote request

A few details is enough. FCPR will contact you about the job. Prefer email? Send us an email

Submitting this form sends your request to FCPR. See our Privacy Policy.